联系我们 人才招聘 加入收藏
       
万国权
名誉顾问
万国权
李蒙
顾问
李蒙
     
 正在招标
 污水处理工程招标公告
 中央空调主机设备招标公...
 垃圾渗滤液处理系统招标...
 采购信息
 求购稀土镁
 求购有机玻璃显示窗
 求购高温保护膜
        招商引资
   
宁波溪口天湖景区建设项目
天湖景区建设项目拟建在宁波溪口雪窦山风景名胜区。区域总面积约1.5万余亩,山脉东西延伸,水系南北交汇,海拔高度150米以上的山峰有12座,悬崖绝壁10余处,天然岩洞3个,水库2座,植被覆盖率在90%以上,属典型的丹霞地貌。景区内峰峦连绵、湖山辉映、景色秀美。景区紧临省道江拔线、甬金高速、交通便捷、毗邻溪口和滕头风景区,有很好的市场辐射带动效应。景区内可开发利用的低山缓坡约1500余亩。目前总体规划设计已通过专家评审,规划定位为:养生度假,建国内第一家养生博览园,创华东养生度假第一品牌,以养生旅游产品的开发带动溪口度假旅游的发展,按功能分为四大区域:分别是园艺商贸综合区、企业文化交流中心、休闲娱乐区和养生度假区。按“总体规划、分期实施”的思路开发建设,第一期将投资2亿元人民币,开发区域暂定3000亩,建设周期约三年。景区计划总投资约12.6亿元人民币。

Ningbo Xikou Sky Lake Scenic Spot Construction Project

Sky Lake Scenic Spot Construction Project is expected to be constructed in the Snow Hole Scenic Area in Xikou, Ningbo. The total area is about 10,000,000m2. The mountains here extend to the eastwest joining the south and north water systems. The number of mountains which are over 150m high reaches 12.  More than 10 cliffs, 3 natural grottoes and 2 reservoirs lie in this typical Danxia landform area. More than 90% of this area is covered by plants. The lake and the hills add radiance and beauty to each other The scenic spot is close to provincial highway Jiangba Line and Ningbo-Jinhua Expressway neighbouring Xikou and Tengtou scenic areas. Owing to its convenient transportation, it brings sound market-driven radiation effect. There are more than 1,000,000m2 low hill and gentle slopes exploitable at the scenic spot. Current general plan is approved by expert panel, and the planning is positioned to build the first national lifestyle expo hall for lifestyle vacations, create first brand of lifestyle vocations in the East China, drive the tourism development of Xikou by developing lifestyle products. The area are divided into four functional zones: art, commerce and trade zone, corporate culture exchange center, leisure entertainment zone and lifestyle vocation zone. The project will be developed as planned in the “general plan, execution in phase”. In the first phase, RMB200 million is to be invested and 2,000,000m2 area is to be developed and it will cost nearly 3 years. The total investment will amount to RMB1.26 billion.

【打印文章】  【关闭本页】  发布时间:2011-5-12
 
  联系我们 加入收藏

Copyright(C)2004-2014年 中国经济技术国际交流协会 版权所有 京ICP备10005928号-1